How Much Does a Bathroom Renovation Cost in Melbourne? (2026 Guide)

30 minutes ago
4 min read

Short answer: a full bathroom renovation in Melbourne starts at about $25,000 and most land between $25,000 and $45,000. The single biggest swing is whether the layout moves. If the toilet or shower stays where it is, you're at the low end. If they move, you're paying for new drainage, and that's where budgets jump.

This guide breaks down where the money goes, what pushes a bathroom up or down the range, and how to tell whether you need a full renovation or something cheaper.

Melbourne bathroom renovation costs at a glance

  • Full renovation, same layout: $25,000 to $32,000, 4 to 6 weeks

  • Full renovation, layout changes: $32,000 to $45,000, 5 to 8 weeks

  • Bathroom and ensuite together: $45,000 to $75,000, 7 to 11 weeks

  • Powder room added to a bathroom job: $8,000 to $14,000, runs in parallel

These are strip-back-to-frame figures: everything out, new waterproofing, new services, new floor falls, tiling and fixtures. They are not "freshen it up" figures. If a quote comes in well under $20,000 for a full bathroom, something on this list isn't being done.

What's actually in the $25,000

People are often surprised that a small room costs this much. It's because a bathroom is almost entirely trades and almost no floor area. Roughly, a same-layout job breaks down as:

  • Strip-out and disposal: old linings, tiles, fixtures and the skip. Around 5%.

  • Plumbing and electrical: new rough-in, new hot and cold, new circuits for lighting, exhaust and heated towel rail. 20 to 25%, and the first thing to rise if the layout changes.

  • Carpentry and linings: framing repairs, new wall sheeting, levelling the floor and setting the falls so water actually goes to the drain. 10 to 15%.

  • Waterproofing certified to AS 3740: the membrane, the junctions, the height it runs to, and the certificate that says it was done. 5 to 8%. It's the cheapest thing on this list to do badly and the most expensive to fix later.

  • Tiling: labour is most of it; the tiles themselves are a smaller share than people expect. 20 to 25%.

  • Fixtures and fittings: vanity, toilet, tapware, shower screen, mirror, accessories. 15 to 25% depending on what you choose.

  • Painting, finishing and certification: the last 5 to 10%.

Move a toilet and you add drainage work under the floor. Move a shower and you add drainage plus a new waterproofing zone. Each is a few thousand dollars on its own; both together is where a $28,000 bathroom becomes a $40,000 one.

The five things that move the price

  1. Whether the layout changes. Covered above. It's the one question that matters most, and it's the first thing we look at on a call.

  2. What's behind the walls. Melbourne has a lot of 1960s to 80s bathrooms sitting on original waterproofing, which is to say none. If the membrane has failed, there's often rot in the framing or the subfloor. We can't see it until the strip-out, which is why we price a contingency into the quote rather than surprising you with a variation.

  3. Fixture tier. A sound mid-range tapware, vanity and toilet package runs $3,000 to $5,000. A designer package can run $10,000 or more for the same room. Neither is wrong, but it's the part of the budget you control completely.

  4. Tile size and format. Large-format tiles cost more to lay than standard ones. Mosaics cost more again. Floor-to-ceiling tiling versus tiling to 1.2m is a labour difference, not a materials one.

  5. Heritage or period homes. Terraces in Yarraville, Seddon and Footscray often have bathrooms built into lean-to additions with uneven floors, odd ceiling heights and services that run through the kitchen. They renovate beautifully, but they take longer and the quote reflects it.

Do you actually need a full renovation?

Honestly, not always. If your bathroom is structurally sound, the waterproofing is intact and you just want it to look newer, a resurfacing or regrouting specialist will get you most of the way for $3,000 to $8,000. That isn't what we do, and we'd rather tell you that on the phone than quote you a bathroom you don't need.

The test is simple: any sign of water where it shouldn't be (a soft floor near the shower, staining on the ceiling below, tiles that sound hollow, mould that keeps coming back) means the membrane has gone, and resurfacing on top of it just hides the problem until it's worse. That's a full renovation.

If you've got two wet areas, do them together

Most Melbourne homes have a bathroom, an ensuite and a laundry all installed within a year of each other. They fail within a year of each other too.

Doing two at once is meaningfully cheaper than two separate projects. The strip-out, services and waterproofing stages overlap, trades mobilise once, and you live through one disruption instead of two. A bathroom and ensuite together typically runs $45,000 to $75,000 over 7 to 11 weeks, against two separate jobs that would each sit at the top of their own range.

How long you'll be without a bathroom

A same-layout bathroom is 4 to 6 weeks on site. Layout changes push it to 5 to 8. If it's your only bathroom, plan for that, and ask your builder to be straight with you about it at quoting stage rather than halfway through.

What a real quote looks like

Be wary of a price given over the phone or from photos. A proper bathroom quote follows a site visit, and it should:

  • Itemise the scope so you can see what's in and what's out

  • Name the waterproofing standard (AS 3740) and confirm you'll get the certificate

  • State the fixture allowance so you know what tier the price assumes

  • Include a contingency for what's behind the walls, with the rule for how it's used

  • Give you a timeframe in weeks, not "a few weeks"

Get a real number for your bathroom

Our bathrooms start at $25,000. If you're not sure yours fits, book a free 20-minute call. We'll ask about the layout, the age of the house and what's prompting the renovation, and we'll tell you whether we're the right builder for it, or point you to someone cheaper if we're not.